Requirement discussion
Agree the application, quantity, destination and what the buyer considers critical. Identify missing details before approaching suppliers.
HXGT / SOURCING WORKFLOW
An illustrative building-materials procurement journey, showing the decisions and handovers between inquiry, sourcing and destination receipt.

THE PROCUREMENT JOURNEY
Follow the brief, the decision and the record—not just the movement of goods.
Discuss a real requirement ↗Agree the application, quantity, destination and what the buyer considers critical. Identify missing details before approaching suppliers.
Translate drawings and specifications into a consistent schedule. Keep product references and document revisions visible.
Compare product fit, sample approach and commercial assumptions. Record exclusions rather than treating quotations as identical.
Review dimensions, finish, material and accessories. Record any requested revision before production is released.
Follow the agreed milestones. Discuss substitutions, delays or deviations before they become unrecorded changes.
Perform the agreed checks and record observations. Report open issues for the relevant acceptance or corrective-action decision.
Review protection, identification and packaging configuration for the agreed shipment scope. Do not assume appearance alone proves suitability.
Connect receipt quantities and order references. Coordinate mixed suppliers without losing traceability between individual items and the final shipment.
Align cargo readiness, loading arrangements and shipping documents. Review quantities and visible condition before dispatch.
The receiving party checks delivered quantities and visible condition against the shipment documents. Exceptions should be recorded promptly.
Any shortage, damage or product issue needs an order reference, a description and clear supporting information. The team can then coordinate the supplier’s review according to the agreed contract.
Installation, site acceptance and equipment commissioning are separate activities unless included in the written scope.
How findings are recorded ↗Tell us which of these stages you need, where responsibilities already sit, and which decisions require your approval.
A product schedule, drawing or reference sample, plus quantities and variants.
Acceptance criteria, required documents, packing constraints and inspection preferences.
Receiving location, timing and the delivery responsibilities you need to discuss.
Share your specifications, quantity and destination. Start with the details that matter.